Capital Tower
All Developments
Islamabad • Delivered (100%)

Capital Tower

An iconic architectural landmark situated in Bahria Town Phase 8, Business District, Rawalpindi, blending cutting-edge structural engineering with ultra-luxury living and commercial excellence.

Total Storeys 1.5 Kanal Land Area
Units / Suites G+7 Floors
Groundbreaking Jan 2022
Estimated Delivery Jan 2024

Precision
Engineering &
Specifications.

Designed and engineered by CAPITAL's master architectural collective, Capital Tower sets a new benchmark for structural integrity and high-caliber urban development.

01

Prime Location & Setting

+

Situated in Bahria Town Phase 8, Business District, Rawalpindi, providing direct access to premier metropolitan hubs, elite commercial districts, and scenic panoramic views.

02

Structural & Seismic Engineering

+

Zone 4 Seismic-resistant reinforced concrete core and post-tensioned floor slabs engineered to withstand extreme environmental stress with maximum structural longevity.

03

Advanced BIM & Smart MEP

+

Built with Building Information Modeling (BIM Level 3), automated VRF climate controls, intelligent power monitoring, and 100% dual synchronized generator backup.

04

Acoustic Glazing & Thermal Facade

+

Double-glazed Low-E acoustic curtain walls engineered for superior solar insulation, UV protection, and complete exterior noise cancellation.

05

Vertical Transit & Security

+

G+7 Floors serviced by high-speed destination-controlled elevators, biometric security access, and 24/7 dedicated concierge.

06

Milestone Progress & Delivery

+

Project milestone progress stands at 100% complete with target delivery and keys distribution scheduled for January 2024.

Floor Plans & Unit Options

Explore bespoke layouts tailored for discerning homeowners, executive offices, and luxury investors.

12 Showrooms & Shops

PKR 18,500,000
Showrooms
12 Units
Clinics
20 Units
Status
Ready to Move
Availability
Immediate

Construction Updates

Real-time engineering progress, structural milestones, and on-site logs for Capital Tower.

Overall Development Completion 100%

No construction updates logged yet for this development.

CMB