Capital Pine Hills Residencia 1
All Developments
Islamabad • Under Construction (75%)

Capital Pine Hills Residencia 1

An iconic architectural landmark situated in DHA Phase 5, Sector K, Islamabad, blending cutting-edge structural engineering with ultra-luxury living and commercial excellence.

Total Storeys 1.5 Kanal Land Area
Units / Suites G+5 Floors
Groundbreaking Mar 2024
Estimated Delivery Sep 2027

Precision
Engineering &
Specifications.

Designed and engineered by CAPITAL's master architectural collective, Capital Pine Hills Residencia 1 sets a new benchmark for structural integrity and high-caliber urban development.

01

Prime Location & Setting

+

Situated in DHA Phase 5, Sector K, Islamabad, providing direct access to premier metropolitan hubs, elite commercial districts, and scenic panoramic views.

02

Structural & Seismic Engineering

+

Zone 4 Seismic-resistant reinforced concrete core and post-tensioned floor slabs engineered to withstand extreme environmental stress with maximum structural longevity.

03

Advanced BIM & Smart MEP

+

Built with Building Information Modeling (BIM Level 3), automated VRF climate controls, intelligent power monitoring, and 100% dual synchronized generator backup.

04

Acoustic Glazing & Thermal Facade

+

Double-glazed Low-E acoustic curtain walls engineered for superior solar insulation, UV protection, and complete exterior noise cancellation.

05

Vertical Transit & Security

+

G+5 Floors serviced by high-speed destination-controlled elevators, biometric security access, and 24/7 dedicated concierge.

06

Milestone Progress & Delivery

+

Project milestone progress stands at 75% complete with target delivery and keys distribution scheduled for September 2027.

Floor Plans & Unit Options

Explore bespoke layouts tailored for discerning homeowners, executive offices, and luxury investors.

Shops, Studio, 1 & 2 Bed

PKR 7,200,000
Units
Multiple Sizes
Status
Available

Construction Updates

Real-time engineering progress, structural milestones, and on-site logs for Capital Pine Hills Residencia 1.

Overall Development Completion 75%

No construction updates logged yet for this development.

CMB